Wall Tie Bracket
Wall tie brackets one half coupler and two half couplers suitable to hold 48.30 OD tube are used to secure the scaffold to a structre.
| Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|
![]() | ![]() | Wall tie bracket 1 coupler | |||
![]() | ![]() | Wall tie bracket 2 coupler |
Related Products
Bridging Ledger
The bridging ledger is provided to achieve a clear span of 4.8m by eliminating the centre set of standards, whilst maintaining the continuity of the scaffold deck.
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 4.8 M | 26.5 | ![]() | 4.8 m Bridging Ledger | ||||
| default variation | 26.5 | ![]() | 4.8 m Bridging Ledger |
Kwikstage Hopup bracket – Straight arm
Board Stage Brackets / hopups fit into the ÒVÓ pressing of the standard which is nearest to the wall. The 2 & 3 BSB have holes into which tie bar pins are attached. They are used to provide cantilevered platform on the inside of the scaffold nearest the wall.
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 2 BOARD WIDE | 6.25 | ![]() | ![]() | 2 board hopup straight arm | |||
| 3 BOARD WIDE | 11.25 | ![]() | ![]() | 3 board hopup straight arm |
Kwikstage Hopup – Spigot
Hopups with spigots give more flexibility by fitting standards in the spigot and run handrails on the v press
| Size | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|
| 3 BOARD WIDE | ![]() | ![]() | 3 Board Hopup with Spigot | |||
| 2 BOARD WIDE | ![]() | ![]() | 2 Board Hopup with Spigot |
Double C Clips
Used to Join Kwikstage scaffolding Standards Back to Back for more stability and steenght to the scaffold structure
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 1.5 | ![]() | ![]() | Double C Coupler | |||
| default variation | 1.5 | ![]() | ![]() | Double C Coupler |
Kwikstage Standards
Standards are vertical structural member of the scaffold system which are made from 48.3 OD X 4mm Tubes. Standards have ÒVÓ pressings in clusters at 495 mm centres, which provide location points for Transoms, Ledgers, Braces,, Hopups etc and a spigot fixed at the top
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 3 | ![]() | ![]() | Standard Topper | |||
| 0.5 M | 3.6 | ![]() | ![]() | 0.5 m standard | |||
| 1.0 M | 6.5 | ![]() | ![]() | 1.0 m standard | |||
| 1.5 M | 9.15 | ![]() | ![]() | 1.5 m standard | |||
| 2.0 M | 12.15 | ![]() | ![]() | 2.0 m standard | |||
| 2.5 M | 14.7 | ![]() | ![]() | 2.5 m standard | |||
| 3.0 M | 17.5 | ![]() | ![]() | 3.0 m standard |


