0.3 M
Kwikstage Standards
Standards are vertical structural member of the scaffold system which are made from 48.3 OD X 4mm Tubes. Standards have ÒVÓ pressings in clusters at 495 mm centres, which provide location points for Transoms, Ledgers, Braces,, Hopups etc and a spigot fixed at the top
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 3 | ![]() | ![]() | Standard Topper | |||
| 0.5 M | 3.6 | ![]() | ![]() | 0.5 m standard | |||
| 1.0 M | 6.5 | ![]() | ![]() | 1.0 m standard | |||
| 1.5 M | 9.15 | ![]() | ![]() | 1.5 m standard | |||
| 2.0 M | 12.15 | ![]() | ![]() | 2.0 m standard | |||
| 2.5 M | 14.7 | ![]() | ![]() | 2.5 m standard | |||
| 3.0 M | 17.5 | ![]() | ![]() | 3.0 m standard |
End Toe Board Bracket
End Toe Board brackets also called toe board Clips are fabricated brackets placed on the outside of a scaffold standard to allow toe boards to be installed .
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 1 | ![]() | ![]() | end toe board bracket | |||
| default variation | 1 | ![]() | ![]() | end toe board bracket |
Toe board bracket
Toe baord brackets also known as toe board clips are Clamped to the standard with a captive wedge to hold the batten toe board vertically in place.
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 0.85 | ![]() | ![]() | Toe board bracket | |||
| default variation | 0.85 | ![]() | ![]() | Toe board bracket |
Double C Clips
Used to Join Kwikstage scaffolding Standards Back to Back for more stability and steenght to the scaffold structure
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 1.5 | ![]() | ![]() | Double C Coupler | |||
| default variation | 1.5 | ![]() | ![]() | Double C Coupler |
Step down bracket
The first step onto a stair access or ladder access is always difficult due to site constraints, ground levels and base outs. The use of the adjustable step down bracket gives the comfort of adjustment to balance the variables so the step becomesbalanced when getting on or getting off a stair access at ground level.
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 4.3 | ![]() | ![]() | one step down bracket | |||
| 0.3 M | 6.5 | ![]() | ![]() | Two step down bracket |
Steel Pallet – stillage
A steel structure built to hold goods in a stable fashion while being lifted by a forklift to stock, stack-up and transport
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 35 | ![]() | ![]() | steel pallet / stillage | |||
| default variation | 35 | ![]() | ![]() | steel pallet / stillage |
Mesh pallet – cage pallet
A steel structure built to hold goods in a stable fashion while being lifted by a forklift to stock, stack-up and transport
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 66 | ![]() | ![]() | Mesh pallet / cages | |||
| default variation | 66 | ![]() | ![]() | Mesh pallet / cages |
Wall Tie Bracket
Wall tie brackets one half coupler and two half couplers suitable to hold 48.30 OD tube are used to secure the scaffold to a structre.
| Size | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|
| 0.3 M | ![]() | ![]() | Wall tie bracket 1 coupler | |||
| 0.3 M | ![]() | ![]() | Wall tie bracket 2 coupler |
Steel Pallet – stillage
A steel structure built to hold goods in a stable fashion while being lifted by a forklift to stock, stack-up and transport
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 35 | ![]() | ![]() | steel pallet / stillage | |||
| default variation | 35 | ![]() | ![]() | steel pallet / stillage |
Mesh pallet – cage pallet
A steel structure built to hold goods in a stable fashion while being lifted by a forklift to stock, stack-up and transport
| Size | Weight | Painted | Galvanised | Item Description | Quantity | ||
|---|---|---|---|---|---|---|---|
| 0.3 M | 66 | ![]() | ![]() | Mesh pallet / cages | |||
| default variation | 66 | ![]() | ![]() | Mesh pallet / cages |
Double Putlog Coupler
Makes connection of putlogs and transoms to standard scaffold tube while allowing scaffold boards to be laid on top of the tube.
| Size | Weight | Item Description | Quantity | ||
|---|---|---|---|---|---|
| 0.3 M | 1.1 | No Description | |||
| default variation | 1.1 | No Description |
External Joint Pin
A one piece heavy duty coupler for rapid connection featuring a central baffle plate for correct tube positioning and unique individual one side unlocking safety feature.
| Size | Weight | Item Description | Quantity | ||
|---|---|---|---|---|---|
| 0.3 M | 1.5 | No Description | |||
| default variation | 1.5 | No Description |
Showing 1–12 of 24 resultsSorted by price: low to high

